Does the institution meter all energy consumption (electricity, natural gas, purchased steam, etc.) for at least one building?:
Yes

None
A brief description of the metering system:
Buildings that are metered for all energy consumption include the Bullock Science Center, Alston Campus Center, and Anna. I. Young Alumnae House. Additionally each building on campus has its own natural gas meter and the Automated Logic control system monitors the electrical use in each building.

None
The website URL where information about the metering system is available:
---

Data source(s) and notes about the submission:
---

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.