Overall Rating | Platinum - expired |
---|---|
Overall Score | 85.56 |
Liaison | Tonie Miyamoto |
Submission Date | Feb. 7, 2017 |
Executive Letter | Download |
Colorado State University
OP-4: Building Design and Construction
Status | Score | Responsible Party |
---|---|---|
2.24 / 3.00 |
Carol
Dollard Energy Engineer Facilities Management |
"---"
indicates that no data was submitted for this field
Total floor area of newly constructed or renovated building space (include projects completed within the previous five years) :
1,370,865
Square feet
Certified Projects
0
Square feet
Floor area of newly constructed or renovated building space certified at each level under a rating system for design and construction used by an Established Green Building Council (GBC) :
Certified Floor Area | |
LEED BD+C Platinum or at the highest achievable level under another rating system | 80,107 Square feet |
LEED BD+C Gold or at the 2nd highest level under another 4- or 5-tier GBC rating system | 828,806 Square feet |
Certified at mid-level under a 3- or 5-tier GBC rating system for design and construction (e.g. BREEAM, CASBEE, DGNB, Green Star) | 0 Square feet |
LEED BD+C Silver or at a step above minimum level under another 4- or 5-tier GBC rating system | 273,308 Square feet |
LEED BD+C Certified or certified at minimum level under another GBC rating system | 0 Square feet |
Floor area of newly constructed or renovated building space certified under a non-GBC rating system for design and construction (e.g. Green Globes NC, Certified Passive House):
6,497
Square feet
Percentage of newly constructed or renovated building space certified under a green building rating system for design and construction:
86.71
If reporting certified projects, provide:
LEED Platinum Certified: Powerhouse Energy Campus Addition, The Pavilion
LEED Gold BD+C: Scott Bioengineering, Laurel Village Residence Halls, Aggie Village North
LEED Gold ID+C: LSC Theater, Durrell
LEED Silver BD+C: Morgan Library Cube, Avenir Museum Expansion, Lory Student Center Revitalization
Green Globes - Interiors: University Art Museum Addition (1 Green Globe)
If reporting uncertified projects, provide:
Uncertified Projects
182,147
Square feet
If reporting published green building guidelines or policies, provide the following:
---
The green building guidelines or policies:
Colorado Senate Bill 51-07 - All buildings that receive 25% or more of state funding shall pursue LEED Gold Certification. Since 2007 the campus has extended that goal to all new buildings and major renovations even if there is no state funding.
http://www.leg.state.co.us/clics/clics2007a/csl.nsf/fsbillcont3/8EFE2CB5022F6CF687257251007C22D3?open&file=051_enr.pdf
Do the green building guidelines or policies cover the following?:
Yes or No | |
Impacts on the surrounding site (e.g. guidelines to reuse previously developed land, protect environmentally sensitive areas, and otherwise minimize site impacts) | Yes |
Energy consumption (e.g. policies requiring a minimum level of energy efficiency for buildings and their systems) | Yes |
Building-level energy metering | Yes |
Use of environmentally preferable materials (e.g. guidelines to minimize the life cycle impacts associated with building materials) | Yes |
Indoor environmental quality (i.e. guidelines to protect the health and comfort of building occupants) | Yes |
Water consumption (e.g. requiring minimum standards of efficiency for indoor and outdoor water use) | Yes |
Building-level water metering | Yes |
A brief description of the green building guidelines or policies and/or a list or sample of buildings covered:
The state of Colorado has mandated that all new construction recieving 25% state funding be built to nationally accepted LEED Gold standards.
http://www.facilities.colostate.edu/index.asp?url=construction/home
Additional information can be found at: http://www.fm.colostate.edu/projects/
None
A brief description of how the institution ensures compliance with green building design and construction guidelines and policies:
The design team is expected to follow the LEED process and use the LEED rating system as a project guide, regardless of the actual requirements set by the University for specific projects. For all projects, the design team is required to organize the design and coordination efforts to follow the intent of an integrated and collaborative design process. The design process shall be integrated to develop and review design alternatives, perform first cost analyses, gain resolution on the project approach, determine the evaluation criteria, and to develop programmatic and sustainable design goals. In addition, the President's Sustainability Committee reviews new building proposals as a standing practice.
Optional Fields
Additional documentation to support the submission:
---
Data source(s) and notes about the submission:
---
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.