Overall Rating | Gold - expired |
---|---|
Overall Score | 72.62 |
Liaison | Lisa Kilgore |
Submission Date | March 7, 2014 |
Executive Letter | Download |
Cornell University
OP-19: Construction and Demolition Waste Diversion
Status | Score | Responsible Party |
---|---|---|
0.58 / 1.00 |
Spring
Buck R5 Manager Facilities Operations |
Criteria
Institution diverts non-hazardous construction and demolition waste from the landfill and/or incinerator.
Soil and organic debris from excavating or clearing the site do not count for this credit.
Applicability
This credit applies to all institutions that have conducted a major construction and/or demolition project in the past three years.
Scoring
Institutions earn the maximum 1 point for this credit by diverting all of their non-hazardous construction and demolition waste from the landfill or incinerator in a one-year period. Incremental points are available based on the percentage of waste that is diverted. For example, an institution that diverts 50 percent of its construction and demolition waste would earn 0.5 points (half of the points available for this credit).
Measurement
Timeframe
Report on the most recent data available for a one-year period.
Sampling and Data Standards
Not applicable
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.