Overall Rating | Silver |
---|---|
Overall Score | 46.21 |
Liaison | Chris Gardner |
Submission Date | Aug. 23, 2022 |
Douglas College
OP-2: Greenhouse Gas Emissions
Status | Score | Responsible Party |
---|---|---|
8.00 / 8.00 |
Louie
Girotto Associate Director Physical Plant Services & Projects |
"---"
indicates that no data was submitted for this field
Scope 1 and Scope 2 GHG emissions
Gross GHG emissions
Performance year | Baseline year | |
Gross Scope 1 GHG emissions from stationary combustion | 1,322 Metric tons of CO2 equivalent | 1,474 Metric tons of CO2 equivalent |
Gross Scope 1 GHG emissions from other sources | 1.25 Metric tons of CO2 equivalent | 2 Metric tons of CO2 equivalent |
Gross Scope 2 GHG emissions from imported electricity | 248 Metric tons of CO2 equivalent | 355 Metric tons of CO2 equivalent |
Gross Scope 2 GHG emissions from imported thermal energy | 0 Metric tons of CO2 equivalent | 0 Metric tons of CO2 equivalent |
Total | 1,571.25 Metric tons of CO2 equivalent | 1,831 Metric tons of CO2 equivalent |
Carbon sinks
Performance year | Baseline year | |
Third-party verified carbon offsets purchased | 1,852 Metric tons of CO2 equivalent | 2,067 Metric tons of CO2 equivalent |
Institution-catalyzed carbon offsets generated | 0 Metric tons of CO2 equivalent | 0 Metric tons of CO2 equivalent |
Carbon storage from on-site composting | 0 Metric tons of CO2 equivalent | 0 Metric tons of CO2 equivalent |
Carbon storage from non-additional sequestration | 0 Metric tons of CO2 equivalent | 0 Metric tons of CO2 equivalent |
Carbon sold or transferred | 0 Metric tons of CO2 equivalent | 0 Metric tons of CO2 equivalent |
Net carbon sinks | 1,852 Metric tons of CO2 equivalent | 2,067 Metric tons of CO2 equivalent |
If total performance year carbon sinks are greater than zero, provide:
The entire BC Public Sector purchases offsets in the same way, with the Provincial Government of British Columbia's Climate Action Secretariat (CAS) sourcing verified emission reduction units and retiring them on the public sectors behalf.
More Info for on the CNAR Program and specifics related to carbon offset projects can be found here:
https://www2.gov.bc.ca/gov/content/environment/climate-change/public-sector/cnar
More Info for on the CNAR Program and specifics related to carbon offset projects can be found here:
https://www2.gov.bc.ca/gov/content/environment/climate-change/public-sector/cnar
Adjusted net GHG emissions
Performance year | Baseline year | |
Adjusted net GHG emissions | 0 Metric tons of CO2 equivalent | 0 Metric tons of CO2 equivalent |
Performance and baseline periods
Performance year | Baseline year | |
Start date | Jan. 1, 2020 | Jan. 1, 2010 |
End date | Dec. 31, 2020 | Dec. 31, 2010 |
A brief description of when and why the GHG emissions baseline was adopted:
2010 was chosen as our baseline year since this was the first year that Douglas completed a comprehensive greenhouse gas inventory as per the standardized methodology legislated by the Provincial Government of British Columbia for all public sector organizations.
Part 1. Reduction in GHG emissions per person
Weighted campus users
Performance year | Baseline year | |
Number of students resident on-site | 0 | 0 |
Number of employees resident on-site | 0 | 0 |
Number of other individuals resident on-site | 0 | 0 |
Total full-time equivalent student enrollment | 10,544 | 7,109 |
Full-time equivalent of employees | 1,186 | 919 |
Full-time equivalent of students enrolled exclusively in distance education | 634 | 285 |
Weighted Campus Users | 8,322 | 5,807.25 |
Metrics used in scoring for Part 1
Performance year | Baseline year | |
Adjusted net Scope 1 and 2 GHG emissions per weighted campus user | 0 Metric tons of CO2 equivalent | 0 Metric tons of CO2 equivalent |
Percentage reduction in adjusted net Scope 1 and Scope 2 GHG emissions per weighted campus user from baseline:
0
Part 2. GHG emissions per unit of floor area
Performance year floor area
122,103
Gross square meters
Floor area of energy intensive building space, performance year:
Floor area | |
Laboratory space | 9,905 Square meters |
Healthcare space | 0 Square meters |
Other energy intensive space | 1,239 Square meters |
EUI-adjusted floor area, performance year:
143,151.94
Gross square meters
Metric used in scoring for Part 2
0
MtCO2e per square meter
A brief description of the institution’s GHG emissions reduction initiatives:
Key initiatives taken between January 1, 2020 and December 31, 2020 to reduce greenhouse gas emissions include:
New Westminster campus
- Car sharing options for students and employees for nine cars at this campus.
- Upgrade of 17 pneumatic VAV boxes to electronic, to improve temperature control and reduce energy waste.
- Single-pane exterior glazing replaced with double-pane on the south building, level 4.
- 19,820 lbs of scrap metal were collected, shredded and recycled.
Lighting upgrades:
- Installation of LED lighting in the Carnarvon Parkade with motion detectors and daylight sensors. The LED fixtures use less than half the power and the lights over the parking stalls dim to 20% after 20 minutes and then shut off 20 minutes later if no motion is detected. The lights also have photo sensors so if there is enough daylight they stay off.
- Upgrade of Carnarvon Parkade stairwell lighting (pot & exit lights).
- Installation of LED lights with motion detectors in all stairwells. The new lights use 50% of the power and are set to dim to 20% when not in use.
- Installation of 60 LED lights in the Bookstore. The new lights use 50% of the power and are now tied into our lighting control system.
- Retrofitted all hallway fixtures to LED and replaced 1,000 32-watt fluorescent tubes with 9.5-watt LED tubes. New drivers were installed and all the lenses were cleaned, eliminating the need for maintenance for another 40,000 hours.
Centralized Student Services Renovation
- Upgrade of all lighting to LED with occupancy and daylight sensors.
- Upgrade of all VAV boxes from pneumatic to electronic and installation of DDC controls.
- Installation of occupancy sensors that turn off lights when rooms are vacant and switch VAV boxes into vacancy mode, resulting in energy savings from both the lighting and HVAC systems.
- DIRTT Wall system used in major renovation of 2nd floor: Over 12,350 lbs of drywall waste prevented from entering landfill (eliminates 4,820 lbs of H2S and 10, 170 lbs of CO2e); 146 lbs of paint-based VOCs and 20 lbs of drywall mud and tape-based VOCs prevented from off-gassing; 58% recycled and 1.2% bio-based content in wall solution; 1,690 recycled denim jeans in wall insulation and 53% less CO2e than conventional fiberglass insulation.
Coquitlam campus
Lighting upgrades:
- Installation of LED lighting in the parkade that uses less than half the power of previous lighting. Lights over the parking spots dim to 30% if no motion is detected then shut off after 20 minutes.
- Installation of LED lighting in most stairwells with motion detectors for dimming to 20%.
- Replacement of 40 2-tube fluorescent lights with 20-watt flat panel LED fixtures c/w motion detectors, which use less than half the power and have a life expectancy of four times longer.
- Retrofit of all high boiler room lights to LED.
- Retrofit of all exterior metal halide or HPS pole fixtures to LED, including in the surface parking lot. The new LED bulbs use one third of the power compared to the existing bulbs and last at least twice as long, reducing servicing costs.
Both campuses
- Added 17 EV charging stations: 7 in Coquitlam and 8 in New Westminster.
- Replaced plastic straws with paper straws in Food Services.
- Food take-out containers are fully recyclable or compostable.
- Food waste is composted and tracked. Waste oil is recycled.
- 25% of food products are locally produced.
New Westminster campus
- Car sharing options for students and employees for nine cars at this campus.
- Upgrade of 17 pneumatic VAV boxes to electronic, to improve temperature control and reduce energy waste.
- Single-pane exterior glazing replaced with double-pane on the south building, level 4.
- 19,820 lbs of scrap metal were collected, shredded and recycled.
Lighting upgrades:
- Installation of LED lighting in the Carnarvon Parkade with motion detectors and daylight sensors. The LED fixtures use less than half the power and the lights over the parking stalls dim to 20% after 20 minutes and then shut off 20 minutes later if no motion is detected. The lights also have photo sensors so if there is enough daylight they stay off.
- Upgrade of Carnarvon Parkade stairwell lighting (pot & exit lights).
- Installation of LED lights with motion detectors in all stairwells. The new lights use 50% of the power and are set to dim to 20% when not in use.
- Installation of 60 LED lights in the Bookstore. The new lights use 50% of the power and are now tied into our lighting control system.
- Retrofitted all hallway fixtures to LED and replaced 1,000 32-watt fluorescent tubes with 9.5-watt LED tubes. New drivers were installed and all the lenses were cleaned, eliminating the need for maintenance for another 40,000 hours.
Centralized Student Services Renovation
- Upgrade of all lighting to LED with occupancy and daylight sensors.
- Upgrade of all VAV boxes from pneumatic to electronic and installation of DDC controls.
- Installation of occupancy sensors that turn off lights when rooms are vacant and switch VAV boxes into vacancy mode, resulting in energy savings from both the lighting and HVAC systems.
- DIRTT Wall system used in major renovation of 2nd floor: Over 12,350 lbs of drywall waste prevented from entering landfill (eliminates 4,820 lbs of H2S and 10, 170 lbs of CO2e); 146 lbs of paint-based VOCs and 20 lbs of drywall mud and tape-based VOCs prevented from off-gassing; 58% recycled and 1.2% bio-based content in wall solution; 1,690 recycled denim jeans in wall insulation and 53% less CO2e than conventional fiberglass insulation.
Coquitlam campus
Lighting upgrades:
- Installation of LED lighting in the parkade that uses less than half the power of previous lighting. Lights over the parking spots dim to 30% if no motion is detected then shut off after 20 minutes.
- Installation of LED lighting in most stairwells with motion detectors for dimming to 20%.
- Replacement of 40 2-tube fluorescent lights with 20-watt flat panel LED fixtures c/w motion detectors, which use less than half the power and have a life expectancy of four times longer.
- Retrofit of all high boiler room lights to LED.
- Retrofit of all exterior metal halide or HPS pole fixtures to LED, including in the surface parking lot. The new LED bulbs use one third of the power compared to the existing bulbs and last at least twice as long, reducing servicing costs.
Both campuses
- Added 17 EV charging stations: 7 in Coquitlam and 8 in New Westminster.
- Replaced plastic straws with paper straws in Food Services.
- Food take-out containers are fully recyclable or compostable.
- Food waste is composted and tracked. Waste oil is recycled.
- 25% of food products are locally produced.
Website URL where information about the institution's GHG emissions is available:
---
Additional documentation to support the submission:
Data source(s) and notes about the submission:
---
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.