OP-22: Rainwater Management

Status Score Responsible Party
Complete 2.00 / 2.00 Duncan Pollock
AVP Campus Services
Campus Services
"---" indicates that no data was submitted for this field

Which of the following best describes the institution’s approach to rainwater management?:
Comprehensive policies, plans or guidelines that require LID practices for all new projects

A brief description of the institution’s green infrastructure and LID practices:
Emerson is located in downtown Boston, and is therefore subject to Boston's new construction building performance standards. Emerson complies with all standards and regulations.

In the case of LID, according to Boston Zoning Code – Article 32, all new construction within our zone must adhere to the following:
“Section 32-6. Standards. To obtain a conditional use permit from the Board of Appeal, the Applicant shall show that the Proposed Project complies with the following requirements, in addition to the standards set forth in Article 6:(a) provision that any Proposed Project promote infiltration of rainwater into the ground by capturing within a suitably designed system a volume of rainfall on the lot equivalent to no less than 1.0 inch across that portion of the surface area of the lot to be occupied by the Proposed Project…and (b) provision that any Proposed Project result in no negative impact on groundwater levels within the lot in question or adjacent lots, subject to the terms of any (i) dewatering permit or (ii) cooperation agreement entered into by the Proponent and the Boston Redevelopment Authority, to the extent that such agreement provides standards for groundwater protection during construction.”

Because of this code, the college's newly constructed buildings have rainwater capture systems on their roofs that provide non-potable water for campus bathroom toilets.

Buildings that currently have rainwater capture include Piano Row (150 Boylston), Colonial (100 Boylston), 2 Boylston Place, and the Little Building (80 Boylston).

A copy of the institution’s rainwater management policy, plan, and/or guidelines:
---

A brief description of the institution’s rainwater management policy, plan, and/or guidelines that supports the responses above:
GROUNDWATER CONSERVATION OVERLAY DISTRICT
SECTION 32-1. Statement of Purpose. The purposes of this article are
to (a) prevent the deterioration of and, where necessary, promote the restoration
of, groundwater levels in the city of Boston; (b) protect and enhance the city’s
historic neighborhoods and structures, and otherwise conserve the value of its
land and buildings; (c) reduce surface water runoff and water pollution; and (d)
maintain public safety.

Optional Fields 

Website URL where information about the institution’s green infrastructure and LID practices is available:
Additional documentation to support the submission:
---

Data source(s) and notes about the submission:
---

The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.