Overall Rating | Silver - expired |
---|---|
Overall Score | 45.39 |
Liaison | Olivia Herron |
Submission Date | March 6, 2013 |
Executive Letter | Download |
Miami University
OP-2: Building Design and Construction
Status | Score | Responsible Party |
---|---|---|
0.85 / 4.00 |
John
Seibert University Architect Physical Facilities |
"---"
indicates that no data was submitted for this field
None
New building space that meets "Eligible Buildings Criteria":
92,321
Square feet
None
New building space that was designed and constructed in accordance with green building policies or guidelines but not LEED certified:
52,321
Square feet
None
New building space that is LEED Certified :
0
Square feet
None
New building space that is LEED Silver certified:
0
Square feet
None
New building space that is LEED Gold certified :
0
Square feet
None
New building space that is LEED Platinum certified:
0
Square feet
None
The website URL where a copy of the institution's guidelines or policies for green building is available :
None
An electronic copy of the guidelines or policies :
---
None
The date(s) the policies or guidelines were adopted:
---
None
A brief description of how the institution ensures compliance with green building design and construction guidelines and policies:
---
None
The names of all buildings that are certified under the LEED for New Construction and Major Renovations, LEED for Commercial Interiors, and/or LEED for Core and Shell Green Building Rating Systems:
Farmer School of Business, LEED Silver, New Construction completed in 2009
(FSB did not fit within the 3 year window, and is not included in this credit. It is listed here for reference.)
None
The names of all buildings designed and constructed in accordance with green building guidelines and policies but not LEED certified:
Building renovations that were counted for this credit are:
Laws Hall, Basement and First floor interior rehab, new windows, new HVAC, environmentally preferable materials, indoor air quality design
Stoddard Hall, Added geothermal as part of energy and indoor environmental quality
Elliott Hall, Added geothermal as part of energy and indoor environmental quality
Included in the total square footage but not of green design and construction is:
Marcum Conference Center, 10,000 sf addition and 30,000 of existing rehabbed
Data source(s) and notes about the submission:
New construction and major renovations developed following the signing of the University's Sustainability Commitments and Goals by President Hodge in Spring 2011 are required to meet LEED silver as a minimum. The projects included in this credit as having been designed and constructed in accordance with green building policies or guidelines were influenced by the concurrent development of said Commitments and Goals. Green guidelines are also included in the University's 2010 Design Standards, although these are less comprehensive than those imposed by LEED.
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.