Overall Rating | Silver |
---|---|
Overall Score | 64.57 |
Liaison | Sherri Mason |
Submission Date | June 14, 2023 |
Penn State Erie, The Behrend College
OP-22: Rainwater Management
Status | Score | Responsible Party |
---|---|---|
2.00 / 2.00 |
Randy
Geering SR. Director Business and Operations Maintenance & Operations |
"---"
indicates that no data was submitted for this field
Which of the following best describes the institution’s approach to rainwater management?:
Comprehensive policies, plans or guidelines that require LID practices for all new projects
A brief description of the institution’s green infrastructure and LID practices:
The University has a comprehensive Stormwater Master Plan. This document presents the University’s objectives and methods that are used to correct existing problems and prevent future problems and covers issues related to new development, redevelopment, and where stormwater facilities will be required in their own right. This document also provides a summary of existing stormwater related policies.
Penn State Behrend has installed the following stormwater BMPs:
Rain Gardens: 3
Surface Stormwater Ponds: 8
Subsurface Detention Facilities: 8
The University promotes foremost the use of conservation design practices that preserve and use natural critical hydrologic areas to minimize the impact to the environment. It also promotes the use and application of sound science in our stormwater management practices and does not believe that any Best Management Practice (BMP) or Low Impact Development (LID) method can be used anywhere, or that we can engineer replacements to complex natural hydrologic areas.
Penn State Behrend has installed the following stormwater BMPs:
Rain Gardens: 3
Surface Stormwater Ponds: 8
Subsurface Detention Facilities: 8
The University promotes foremost the use of conservation design practices that preserve and use natural critical hydrologic areas to minimize the impact to the environment. It also promotes the use and application of sound science in our stormwater management practices and does not believe that any Best Management Practice (BMP) or Low Impact Development (LID) method can be used anywhere, or that we can engineer replacements to complex natural hydrologic areas.
A copy of the institution’s rainwater management policy, plan, and/or guidelines:
---
A brief description of the institution’s rainwater management policy, plan, and/or guidelines that supports the responses above:
Our stormwater program includes six minimum control measures: public education, public involvement, illicit discharge detection and elimination, construction site runoff control, post-construction runoff management and pollution prevention/good housekeeping.
The MS4 program can be found at: http://opp.psu.edu/university-ms4-program
The MS4 program can be found at: http://opp.psu.edu/university-ms4-program
Optional Fields
Additional documentation to support the submission:
---
Data source(s) and notes about the submission:
---
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.