Overall Rating | Gold |
---|---|
Overall Score | 70.01 |
Liaison | Rebecca Walker |
Submission Date | April 13, 2022 |
Southern Oregon University
OP-19: Construction and Demolition Waste Diversion
Status | Score | Responsible Party |
---|---|---|
0.80 / 1.00 |
Rebecca
Walker Sustainability Manager Facilities, Management, Sustainability and Planning |
"---"
indicates that no data was submitted for this field
Construction and demolition materials recycled, donated, or otherwise recovered:
330
Metric tons
Construction and demolition materials landfilled or incinerated:
80.44
Metric tons
Percentage of construction and demolition materials diverted from the landfill or incinerator through recycling, donation and/or other forms of recovery:
80.40
Optional Fields
SOU's latest project included a major 9 million dollar renovation for the Britt Hall campus building. The Britt project included structural/seismic upgrades; mechanical, electrical, and plumbing systems replacement; ADA upgrades; and life-safety systems replacement in the 50,000 square foot, 3-story Britt Hall.
Website URL where information about the institution’s C&D waste diversion efforts is available:
---
Additional documentation to support the submission:
Data source(s) and notes about the submission:
Britt Hall Renovation is LEED Silver.
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.