Overall Rating | Gold - expired |
---|---|
Overall Score | 71.57 |
Liaison | Greg Maginn |
Submission Date | Jan. 22, 2016 |
Executive Letter | Download |
The Ohio State University
OP-16: Life Cycle Cost Analysis
Status | Score | Responsible Party |
---|---|---|
0.50 / 1.00 |
John
Rappleye Utility Purchasing Energy Services and Sustainability |
"---"
indicates that no data was submitted for this field
None
Does the the institution employ Life Cycle Cost Analysis (LCCA) as a matter of policy and practice when evaluating energy and water-using products and systems?:
Yes
None
Does the institution employ LCCA as a matter of policy and practice across the operations of the entire institution (i.e. all divisions)?:
No
None
A brief description of the LCCA policy(ies) and practice(s):
Per the university’s Green Build and Energy Policy adopted in 2008, each qualifying building construction project, a life-cycle cost analyses will be undertaken by a qualified engineer or architect and in accordance with the standards established in ORC 3345.69 (http://codes.ohio.gov/orc/3345.69). This will include an energy systems analysis and the results of these analyses will be a primary consideration in developing the project design
None
The website URL where information about the institution’s LCCA policies and practices is available:
---
Data source(s) and notes about the submission:
---
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.