OP-20: Construction and Demolition Waste Diversion
Status | Score | Responsible Party |
---|---|---|
0.84 / 1.00 |
Roseann
Sillasen Associate Director/Project Manager Physical Plant - Facilities |
"---"
indicates that no data was submitted for this field
Construction and demolition materials recycled, donated, or otherwise recovered during the most recent year for which data is available within the previous three years:
2,092.31
Tons
Construction and demolition materials landfilled or incinerated during the most recent year for which data is available within the previous three years:
398.03
Tons
Percentage of construction and demolition materials diverted from the landfill or incinerator through recycling, donation and/or other forms of recovery:
84.02
Optional Fields
The last draft revision of the green building policy was 10/22/14 and includes specifications for recycling construction and demolition debris. C&D policies are also referenced in Major Maintenance FY17 Front End Documents; Specification Section 01505
The website URL where information about the programs or initiatives is available:
---
Additional documentation to support the submission:
---
Data source(s) and notes about the submission:
Used https://your.kingcounty.gov/solidwaste/business/documents/Conversions.pdf for conversion factors
Recycled/Reused Materials:
Asphalt paving recycled: 437 CY (156 High St.) + 2,464 CY (202-256 Washington St.) = 2001.69 tons
Asphalt roofing recycled: 4 CY (125 Cross) + 20 CY (161 Cross) + 16 CY (301 High) = 58.38 tons
Light steel recycled = 1.49 tons
Light iron recycled = 1.47 tons
Light copper recycled = 0.16 tons
Aluminium recycled = 0.16 tons
Steel railings recycled = 0.05 tons
Aluminum storm windows recycled = 0.06 tons (metal and glass)
Aluminum screens recycled (25 qty.) = 0.24 tons
Tablet arm chairs reused (14 qty.) = 0.11 tons
Fisk Hall demolition = 28.5 tons
Landfilled/Incinerated Waste:
Lead waste: Windows, railings, and flooring (60 CY) = 21.3 tons
Roofing (CFA Hall) = 60 tons (may be 87.57 tons)
Roofing (Court St. Apts., 80 CY) = 116.76 tons
Masonry waste = 6 tons
Judd Hall = 120 tons
Exley = 30 tons
Fisk Hall demolition (wood with plaster) = 16.4 tons
The information presented here is self-reported. While AASHE staff review portions of all STARS reports and institutions are welcome to seek additional forms of review, the data in STARS reports are not verified by AASHE. If you believe any of this information is erroneous or inconsistent with credit criteria, please review the process for inquiring about the information reported by an institution or simply email your inquiry to stars@aashe.org.